Friday, June 11, 2021

 

Artificial island Lynetteholm to be built in Copenhagen harbour


Laurence Grigorov, as director of a residential property development company, finds ideas and inspiration from international architectural designs for projects that the company is involved in. Laurence Grigorov has been developing luxury residential projects in Johannesburg, South Africa for nearly 15 years. He is highly influenced by modern design trends and attempts to instill these inspirations in the upcoming projects.

The Danish parliament has approved the building of Lynetteholm, an artificial island off the coast of Copenhagen that will house 35,000 people and protect the city's harbour from rising water.

The 275-hectare Lynetteholm project was designed by COWI, Arkitema and Tredje Natur as a housing and business district that will also become a bulwark against climate-change induced storms.

Lynetteholm will be built by development company By & Havn (City & Port) using soil from construction projects in Copenhagen and the surrounding area.

The artificial island will be located between Nordhavn and Refshaleøen and will protect the city from "more frequent storm surges and rising water masses," said Tredje Natur.

In total homes for 35,000 people will be built on the peninsular that will partially enclose the harbour to act as "climate and storm surge protection".

After winning approval in the Danish parliament, where it was voted in by 85 votes to 12, Lynetteholm is set to be built over the next 50 years. However, it has met resistance from environmental groups, according to the BBC.

This is partly because construction of the island requires transporting 80 million tonnes of soil through the city, which has been estimated to result in 350 lorry journeys per day through the Danish capital during the construction period.

It has also been criticised by the Coalition Clean Baltic, which has "grave concerns" about the project. It says Lynetteholm could have "disastrous consequences" for the Baltic Sea environment.

By & Havn has stated that it will monitor the project's environmental impact.

"The project has been environmentally assessed and qualified in consultation with the country's leading experts and in dialogue with Copenhageners, and therefore the Folketing [parliament] has today been able to adopt Lynetteholm on a well-documented and informed basis," said By & Havn CEO Anne Skovbro.

Marine feasibility studies, archaeological studies and tender for contracts is due to take place later this year and By & Havn expect Lynetteholm to be completed in approximately 30 years.


Words & image courtesy of www.dezeen.com

Thursday, May 21, 2020

Leeza SOHO by Zaha Hadid Architects




Laurence Grigorov, as director of a residential property development company, constantly looks for inspiration from international architectural designs and trends in order to keep the development projects that the company is involved in, relevant and modern. Laurence Grigorov has long admired the work of famed architect Zaha Hadid and the work that the studio continues to produce is both exciting and forward-thinking.
Located on Lize Road in southwest Beijing, Leeza SOHO tower anchors the new Fengtai business district - a growing financial and transport hub between the city centre and the recently opened Beijing Daxing International Airport to the south. The new business district is integral to Beijing’s multi-modal urban plan to accommodate growth without impacting existing infrastructure networks in the centre of the city. 
This 45-story 172,800m² tower responds to demand from small and medium-sized businesses in Beijing for flexible and efficient Grade A office space.
Adjacent to the business district’s rail station at the intersection of five new lines currently under construction on Beijing’s Subway network, Leeza SOHO’s site is diagonally dissected by an underground subway service tunnel.
Straddling this tunnel, the tower’s design divides its volume into two halves enclosed by a single facade shell. The emerging space between these two halves extends the full height of the tower, creating the world’s tallest atrium at 194.15m which rotates through the building as the tower rises to realign the upper floors with Lize road to the north. 
Leeza SOHO’s atrium acts as a public square for the new business district, linking all spaces within the tower and providing varying views due to its twisting, sculptural form; creating a fantastic new civic space for Beijing that is directly connected to the city’s transport network.
Leeza SOHO’s double-insulated, unitised glass curtain wall system steps the glazing units on each floor at an angle, providing narrow ventilating registers to draw outside air through operable cavities where required; creating extremely efficient environmental control for each floor.
At the forefront of 3D Building Information Modelling (BIM) in design, construction management and building operations, Zaha Hadid Architects and SOHO China have implemented proven technologies to reduce the energy consumption and emissions at each of their four collaborations, totalling 15 million square feet (1.4 million sq. m) of mixed-use urban space in Beijing and Shanghai.
Designed to achieve LEED Gold certification by the US Green Building Council, Leeza SOHO’s advanced 3D BIM energy management system monitors real-time environmental control and energy efficiency. These systems also include heat recovery from exhaust air and high-efficiency pumps, fans, chillers boilers, lighting and controls. The tower incorporates water-collection, low-flow rate fixtures and grey water flushing as well as an insulating green roof with photovoltaic array to harvest solar energy.
2,680 bicycle parking spaces, with lockers, shower facilities and dedicated charging spaces for electric and hybrid cars are located below ground; while low volatile organic compound materials are installed throughout Leeza SOHO to minimise interior pollutants and high efficiency filters remove particulates via the air-handling system.
Words and image courtesy of www.architectmagazine.com




Thursday, February 20, 2020

Top 5 Training Mistakes to Avoid


Top 5 Training Mistakes to Avoid

Laurence Grigorov is director at a leading residential property development company based in Johannesburg, South Africa. The company specialises in high-end luxury residential developments. 
Laurence Grigorov enjoys exercise and visits a health club regularly to maintain both his physical health as well as enjoying the mental benefits form regular exercise. Laurence Grigorov believes that a healthy diet will also improve the results form exercise and allows a healthier mind-set for work and play.
Mat Fraser is a familiar name even to many people who aren't CrossFit fans. He's an athlete who can be trusted on the topic of recovery, regardless of your path in fitness!
If you haven't noticed, there are no "secrets" to training, per se. There's knowledge on training, nutrition, and recovery—and continuing to build upon that knowledge—but most often, little things keep us from achieving our desired results in the gym. Sometimes we don't even notice these small mistakes in areas such as rest, movement, and programming.
Believe it or not, Mat Fraser, four-time "Fittest Man on Earth" and XTEND-sponsored athlete, has already made some of the same mistakes you're probably making now. Whether you're pursuing CrossFit or some other path to fitness, Fraser is here to steer you in the right direction toward staying healthy, performing optimally, and lengthening your lifespan in fitness.
It's up to you to take control of the variables that could be holding you back. Here are Fraser's five training mistakes to avoid:

Mistake 1: Not Getting Enough Sleep
Fraser says the biggest thing he would go back and change or tell himself in terms of recovery is to GO TO BED.

"During high school and the early years of college, I thought everyone woke up tired," says Fraser. "I thought being groggy for the first waking hour or two and then pounding down enough caffeine to fully open your eyes was normal. But now I realize how foolish that approach is and how important solid sleep is."
Fraser also points out that just one good night of sleep on occasion won't do much for you. Like all things in fitness, you need to be consistent.

Mistake 2: Being Impatient With Progress
"The biggest mistake I see with people who are new to CrossFit is trying to advance too quickly," says Fraser. "Just because you can do a muscle-up doesn't mean you should. Get the fundamentals down pat before you start adding in more complex movements."
Fraser sees CrossFitters who can barely perform one strict pull-up get up and swing on the rings, attempting to get their first muscle-up. He sees the same thing with Olympic lifters. Many new athletes are under the impression that advanced barbell complexes are the answer to improvement. Fraser answers that with a big "nope."
You have to know when to pull back on the reigns. Says Fraser: "What you probably don't see is that pro Olympic lifter or CrossFit athlete spending a month's worth of workouts with a PVC pipe in their hands, a month doing nothing but a plain snatch and clean and jerk, solely focusing on technique. Get the fundamentals down before trying to make progressions."

Mistake 3: Training Volume That Doesn't Fit Your Needs
The correlation between performance and recovery is a popular topic these days, and Fraser suggests you look not only at what you're doing outside of the gym, but also at your actual training for improvements in this area.
"A big thing that led to better recovery and performance was working on the things I needed to work on," says Fraser. "Doing things exactly the way the top guys in your sport are doing them doesn't mean you will see the same results. Odds are they're doing the things they're doing because that's what they need to work on."
Fraser suggests you analyze what your own deficits are. Ask yourself how you can get better at them. Then, figure out the volume of work that fits best for you—not someone else. This is where better recovery comes in.
"My recovery improved when I realized volume isn't king for me," he says. "It doesn't really do anything for my performance. I tried to train at the same volume as some of the other guys, and it didn't produce the results I was looking for. Now, I train smarter, which for me means lower volume. That helps keep my body feeling its best."

Mistake 4: Avoiding Proper Movement And Muscle Activation
"Another thing that helps performance and even recovery is making sure my body is firing properly and the right muscles are activated when I need them to be," Fraser says.

He points out that shoulder, hip, and knee pain can easily throw this out of whack. When the stabilizer muscles aren't working properly, other muscles begin taking over.
"Your muscles get pulled in funny directions, and over time, or sometimes immediately, it causes injury," he says. "I make sure my movement patterns are correct and keep mobility on point so that I am not putting my body into a vulnerable position."
When you keep the engine running properly by doing regular mobility work and stretching, eating whole foods, and taking your recovery supplements, you lessen the likelihood of getting hurt and make it easier for your body to recover between workouts. Spend time on the little things!

Mistake 5: Not Warming Up Properly For Each Day's Training
You simply cannot be a serious athlete, or even a regular gym-goer pushing heavy weights, and think you can get away with skipping warm-ups.
"Take something like a workout with a heavy dose of ring muscle-ups," says Fraser. "I used to jump up on the rings and do a couple muscle-ups when my heart rate was low to get certain body parts warmed up and ready for the workout," he explains. "But now, I take a step back and ask myself what muscles I'm going to use, and which joints are going to take a pounding. Then I'll base my warm-up on exercises that will get those muscles and joints ready and mimic the movements I'm about to do. This way, when I start to get fatigued, my body naturally defaults to those same patterns."
Fraser says he used to think of warm-ups as wasting 15 minutes of his time. Now, he knows that if he wants the workout to go well—and feel good enough to do another one after—warming up properly is not something you just wing or skip completely.
"Doing everything in my power to prevent injury and just make sure I feel good before training is super important, but it also makes a huge difference in how I feel going into the next workout," he says.
Words and image courtesy of www.bodybuilding.com

Tuesday, February 4, 2020

WEX1 in Woodstock, Cape Town

As director at a residential property development company based in Johannesburg, South Africa, Laurence Grigorov has a keen interest in local architectural and development news and information. This keeps Laurence and his company up to date with the latest trends and designs in the development field.

A new project based in Cape Town appeals to Laurence Grigorov due to its modern and sleek design and architecture.

The multi-faceted creative hub of Woodstock has become even more desirable with the completion of WEX1, a joint mixed-use development by Cape Town property developers Signatura, and Indigo Properties, the owners of the Old Biscuit Mill and Woodstock Exchange. “Woodstock is one of Cape Town’s oldest suburbs and this development is designed to embrace its vibrant mix of tradition, industry and creativity.

They incorporated the highest standards of architecture, interior design and landscaping that buyers expect from Signatura. This is not the first development in Woodstock, but it offers lifestyle and user-friendly features that will make living at WEX1 very appealing,” said Signatura MD, David Cohen.

Developments such as WEX1 aim to transform Albert Road, bringing a vibrant nightlife back to the streets and igniting sustained urban renewal in Cape Town’s creative design hub.

Designed by Vivid Architects, the WEX1 project was envisaged as a complimentary scheme to the successful urban regeneration scheme, The Woodstock Exchange. With the intention to further boost regeneration of the Lower Woodstock district, WEX1 is a mixed used building designed to offer over 1,000m2 of active ground floor retail alongside a small public leisure retail facility on the 4th floor, a boutique hotel and more than 200 new apartments. Located 3km from the Cape Town CBD, WEX1 is situated directly opposite and closely linked to the creative business community of the Woodstock Exchange.

The design represents a contemporary and contextual response to the traditional brick warehouse and is impressive in scale. On approach from the east toward Cape Town, the development complements the scale of the Woodstock Exchange.

A further reinforcement of the relationship between the two buildings is evident in the careful consideration of new landscaping and paving that strongly ties the Woodstock Exchange with WEX1 at the pedestrian realm. Special attention has been made to promote and encourage the pedestrian experience from the train station along Davison Road with crucial corner retail shopfronts forming an interactive experience.

The architecture draws on the materials and ethos of the surrounding precinct, using the brick, glass, and steel of the rail-side industrial warehouses re-formed into a contemporary aesthetic while still aiming to retain a classic, timeless appeal. This fresh design aims to regenerate this urban precinct, located on a pivotal site in Woodstock.




Words and image courtesy of Architect & Builder magazine.

Thursday, January 30, 2020

The Quarter in Green Point, Cape Town



 

Laurence Grigorov, as director of a leading property development firm based in Johannesburg, South Africa, looks for inspiration and insight from current architectural designs and developments. Laurence Grigorov has been developing luxury residential projects for over 15 years.

A new development by Signatura, known as The Quarter, will set new benchmarks for accommodation and easy living in one of the city’s most appealing areas.

Located on the corner of Somerset and De Smit Streets, it will be a natural extension to the acclaimed Media Quarter building, home to M&C Saatchi Abel and other creative practitioners.

“We are delighted at the opportunity to bring our expertise to work on this wonderful location,” said Signatura MD David Cohen.

A total of 69 apartments are planned, starting at 39m² at a cost of R2.1 million. There are also five penthouse units (86m² to 168m²) each with lush garden roof terraces and plunge pools. Parking is available for every unit. Floor-to-ceiling glass sliding doors and windows in the units will make the most of the light and views of the city, mountains and harbour. Multiple features will include airconditioning, underfloor heating, LED lighting and provision for fibre connectivity. An impressive lobby with 24-hour concierge service, top end fittings that include engineered stone tops, SMEG stainless steel ovens and Ceran hobs are all included.

To protect the existing cobblestones in the vicinity, these will be lifted and stored for safeguarding during building, then re-laid. There will be a retail outlet on the ground floor adjacent to the building entrance.

Renato Graca, EHH Architects director, said The Quarter would form a natural, flowing extension to the Media Quarter which was designed by the same firm. The Quarter will draw inspiration from its well established neighbour, speaking a language of glass, aluminium and natural stone. The external palette has been purposefully left neutral, allowing the vibrancy of the neighbourhood and existing vernacular to be left unrivalled whilst complementing its context.”

Signatura’s partners on this project are Nedbank Corporate and Investment Banking, Quenet Property Management company, and Folkes, which has commercial property interests in the UK and South Africa. The Quarter occupation is scheduled for mid-2020.

Laurence Grigorov enjoys keeping abreast of current development projects.



Words & image courtesy of Architect & Builder magazine – June/July 2019

Tuesday, January 28, 2020

The Emerald in Hyde Park

As director at a residential property development company based in Johannesburg, South Africa, Laurence Grigorov keeps track of new and upcoming developments in the Johannesburg area, particularly those in the residential space. Upcoming developments offer Laurence Grigorov an insight in potential residential market trends and changes.

The Emerald Hyde Park is a luxury, state-of-the-art residential development. The Emerald provides the perfect executive lifestyle, conceived with comfort, style and quality urban living in mind. No detail has been overlooked in the design of The Emerald’s 1, 2 and 3 bedroom apartments, with features and fittings delivering an aesthetic that is both minimalistic and environmentally conscious.

Designed by award winning Italian architect, Enrico Daffonchio, The Emerald combines striking contemporary lines and a blend of urban materials. The architectural approach is strongly rooted in Daffonchio’s formative years in northern Italy, where classical architecture coexists with Italian rationalism and a chemistry of tradition and innovation shapes all aspects of design. “We are privileged and proud to shape this fantastic precinct and its extensive landscaping and connect it with the beautiful Hyde Park area.” says Mr. Daffonchio.

With The Emerald, the architects have considered ease of living, accessibility and sustainability - from the well-appointed apartments to the impressive lifestyle centre. Every aspect of the design has been carefully considered to create apartments that are generous in their use of space and feature the finest finishes. Facilities include a café, 24/7 concierge services, fibre connectivity, communal lounges and meeting rooms. Health and leisure facilities include a 25m indoor heated pool, an outdoor heated





Words and image courtesy of Architect & Builder magazine.


Tuesday, January 21, 2020

Foggo Associates - Can of Ham in London


Laurence Grigorov is the director and founder of a residential property development company based in Johannesburg, South Africa. The company is constantly looking to adapt and update the architectural designs and overall product that it provides to its customers. Laurence Grigorov keeps abreast of international trends and designs in order to keep the products offered by his company up to date.

Foggo Associates has designed a curved high-rise in central London at 70 St Mary Axe, which is widely known as the Can of Ham due to its distinctive shape. The 21-storey tower stands on the same street as the Foster + Partners-designed skyscraper at 30 St Mary Axe, which is called the Gherkin, in a grouping of high-rises in the City of London.

Officially named 70 St Mary Axe, the 90-metre-tall block contains 28,000 square metres of office space on its upper 20 floors above 430 square-metres of shops on the first, ground and basement level. The building has an arched profile, with two, curved facades and flat ends creating a distinctive shape that resembles the shape of tins of ham – from which it gets its nickname.

"It could be argued that it is a mark of its iconic nature as other buildings of such recognisable form all seem to gain nicknames," said David Warrender, director at Foggo Associates. "We will take it as a compliment," he told Dezeen.



70 St Mary Axe's unusual form was the result of Foggo Associates wanting to reduce the building's footprint at street level, while creating standard-shaped floors for use as offices.

The building is entirely clad in glass with a series of light-bronze-coloured anodised aluminium fins that run up the curved facades and wrap over the top of the building. At the top of the tower the glass panels are replaced with a mesh to give the appearance of a continuing surface and hide the

"We worked very hard with our Italian cladding contractor, Focchi, to develop a perforated mesh panel which has the appearance of glass between the cladding fins which wrap over the top of the building to screen the plant and equipment which is up there by necessity."

The building is topped with two retractable doors that can open to allow the window cleaning crane to emerge when needed. On the ground floor the building has a double-height entrance atrium, which has a concrete reception-desk set at its centre. Walls in the reception area have been made from individually hand-poured, board-marked concrete panels, which are also used throughout the building's circulation spaces and toilets.

70 St Mary Axe is the latest high-rise to be built in the City of London. It stands near the site of the proposed The Tulip, a 305.3-metre-high viewing tower designed by Foster + Partners. The tower was recently rejected by London's mayor Sadiq Khan.

Words & image courtesy of https://www.dezeen.com/